PROJECT NAME:  A new walk along Idro Lake

TYPOLOGY: Tender | Landscape | Large Size project

YEAR: 2015

DIMENSIONS: 2.5 ha

CLIENT: SWS engineering

CONCEPT: This project is the requalification of two existing areas in proximity and along the Idro Lake, both are environmental compensation works  for a new safety tunnel for the water level of the lake. The western area, the largest, will become a new leisure park with  a system of paths in woods, prairies and planted zones. The smallest park is right along the lake and it is  a promenade 400 m long, that interweaves with the lake and a restored  environment.